Skip to content

Garden Paving

Patios & Paving in Cambridge

A level, well-drained patio surface that stays put through Cambridge’s wet winters and clay-heavy ground.

  • Separate Line Items
  • Ground Survey First
  • Drainage Fall Included
Patios & Paving carried out by a professional landscaping

What Goes Wrong

Why some patios shift, crack, or pool water within two years

The failure is almost always in the preparation, not the slab.

Shallow Sub-Base

A sub-base under 100mm on Cambridge clay compresses unevenly, causing slabs to rock and crack within a season.

Correct Depth Compaction

A compacted MOT Type 1 sub-base at the right depth for ground conditions prevents movement before bedding begins.

No Drainage Fall

A flat patio on clay-heavy ground holds surface water, leaving puddles and accelerating joint and slab deterioration.

Fall Built Into Layout

The drainage fall is set during levelling, not added as an afterthought, so water runs clear from day one.

Wrong Bedding Method

Porcelain laid on a loose sand-only bed cracks under point loads because the dense material needs a rigid, stable base.

Material-Matched Bedding

Porcelain goes on a semi-dry mortar bed; natural stone is back-buttered to account for thickness variation across the batch.

New Build Topsoil

Construction traffic compacts and contaminates topsoil in new build gardens, making it an unstable base for any paved surface.

Excavate & Recompact

Affected topsoil is excavated fully and replaced with compacted sub-base material before any bedding or laying begins.

Materials & Scope

Paving materials and installation scope covered

Each material is quoted as a separate line item so you can compare options before committing.

  • Sub-Base Preparation

    Excavation and compacted MOT Type 1 base layer.

  • Edging & Borders

    Concrete haunching or block edging to retain the perimeter.

  • Jointing & Sealing

    Kiln-dried sand or jointing compound finished flush.

  • Drainage Check

    Fall and run-off verified before sign-off.

Solid Underfoot

Why the ground beneath your patio matters more than the slab on top

A patio that pools water or shifts within two years usually has a preparation problem, not a material problem.

Cambridge clay-heavy ground holds water and moves with seasonal wet and dry cycles. Without a correctly compacted sub-base and a drainage fall built into the layout, even good-quality slabs will shift, crack, or sit in standing water. The site check establishes ground conditions, existing levels, and where surface water needs to go before any material is chosen or ordered.

Paving material affects maintenance, appearance, and longevity. Porcelain slabs are dense and low-maintenance but need a stable, level base to avoid cracking. Natural stone varies in thickness and requires careful bedding. Block paving allows individual unit replacement if damage occurs. Concrete slabs offer a cost-effective finish where budget is the primary constraint. Each option is quoted as a line item so you can compare like for like.

The installation sequence runs from excavation and sub-base compaction through sand bedding, slab laying, and jointing, finishing with a drainage check to confirm the fall is correct. New build gardens in Cambridge often have poorly compacted topsoil from construction traffic, making base preparation especially important. A finished patio is checked for level and drainage before the job is signed off.

Why Choose Us

Why choose us for patios & paving in Cambridge?

Local ground knowledge, separate quotations, and a clear process from survey to sign-off.

Itemised Quotations

Each element, patio, edging, drainage, jointing, is quoted separately so you see exactly what you are paying for.

Cambridge Ground Knowledge

Clay soil conditions and new build compaction issues are factored into every survey and sub-base specification.

Survey Before Ordering

Ground levels and drainage are checked before any material is ordered, avoiding costly changes mid-installation.

Drainage Fall Confirmed at Sign-Off

The completed surface is checked for level and run-off before the job is closed, not left to the customer to discover.

Surveyed Before Quoting

Every enquiry is scoped to the same preparation standards.

A completed garden landscaping job at a house
A finished garden landscaping project

The Process

From enquiry to finished patio in three steps

  1. Submit Your Enquiry

    Describe the area, the ground conditions, and how you want to use the space so the survey is focused.

  2. Survey & Quote

    A site visit checks levels, drainage, and ground conditions, then quotes each element separately.

  3. Installation & Sign-Off

    Sub-base, bedding, laying, and jointing are completed, then the fall and level are checked before handover.

Pricing Estimates

Typical Patios & Paving Prices

JobTypical cost
Small patio£1,675-£2,500
Standard patio£2,500-£4,000
Large patio£4,000-£6,000
Driveway paving£4,800-£14,400
These prices are estimates and often vary with the condition, size and scope of each job. Message or call us for a free, no-obligation quote.
See all prices

Common Questions

Patio & paving questions answered

  • How much will a new patio cost for my garden, and what makes the quote go up once the job is measured properly?

    Guide prices run from £1,675-£2,500 (Small patio) to £4,800-£14,400 (Driveway paving). The figure rises when excavation is deeper than expected, when the ground needs levelling, when a premium material like porcelain is chosen over concrete, or when access is tight and materials must be carried by hand.

  • Why does a new patio sometimes cost more than I expected?

    The two most common causes are ground conditions and material choice. Clay soil often needs deeper excavation and a thicker sub-base, adding labour and skip costs. Choosing porcelain or natural stone over concrete flags can double the material cost alone. A site visit before any figure is agreed avoids most surprises.

  • What is the cheapest patio paving that still looks decent and does the job?

    Concrete paving flags are the most affordable option and come in a range of finishes that suit most gardens. Riven-effect concrete slabs in particular mimic the look of natural stone at a fraction of the price. Laid on a proper mortar bed and pointed correctly, they perform well and last many years.

  • What type of paving slabs are best for a patio in my garden?

    Porcelain slabs are low-maintenance and frost-resistant, making them well suited to the wet Cambridge climate. Natural sandstone gives a warmer look but needs sealing. Concrete flags are the most cost-effective and widely available. The right choice depends on your budget, the garden’s style, and how much upkeep you want.

  • Can I lay patio slabs on just sand?

    No. Sand alone does not provide a stable enough base. Slabs laid on sand shift, rock and allow water to pool underneath, which accelerates frost damage. A compacted hardcore sub-base followed by a mortar bed is the correct method for a patio that stays level and lasts.

  • Do patio slabs need a proper base, or can they go straight on the ground?

    They need a proper base. Slabs laid directly on soil will sink unevenly within one or two winters, particularly on clay ground. The correct build-up is compacted hardcore, a sharp sand and cement bed, then the slabs, pointed with a suitable mortar. Skipping any layer shortens the patio’s life significantly.

  • How much ground preparation is included when a patio is laid?

    Ground preparation typically covers excavation to the required depth, removal of spoil, compaction of a hardcore sub-base, and screeding a mortar bed before slabs are laid. The depth of excavation varies by ground conditions. Any additional drainage work is quoted separately rather than bundled into the patio price.

  • How long does it usually take to lay a patio of around 20 square metres?

    A 20 square metre patio typically takes two to three days from excavation to final pointing. Day one covers digging out and compacting the sub-base; day two covers laying and bedding the slabs; day three covers pointing and clean-up. Drying time before the patio can be used is usually a further 24 to 48 hours.

  • Which areas do you cover for Patios & Paving?

    We cover Patios & Paving in and around Cambridge, including Trumpington, Great Shelford, Sawston, Fulbourn, Histon, Cottenham, Waterbeach, Cambourne and Northstowe. If your area isn’t listed, send us a quick message to check.

Tell Us About Your Garden

Describe the plot, the soil, and how you want to use the space. We schedule a ground survey and quote each element separately.

Start Your Enquiry